New Service & Power Poles · Twin Falls County

New Electrical Service & Power Pole Installation in Twin Falls, Idaho

New home, shop, barn or RV hookup? We install the service — meter base, main panel or disconnect, grounding, trenching and the power pole where needed — and coordinate with Idaho Power or MVEC so the utility can connect you.

Electrician repairing motor wiring in Twin Falls Idaho
Licensed & insuredIdaho DOPL
Twin Falls, Idaho42.56°N 114.46°W
Idaho DOPL LicensedVerify at dopl.idaho.gov
Utility CoordinationIdaho Power & MVEC
Permit & InspectionCity of Twin Falls
Written EstimateBefore Any Work Starts
What a new service includes

The pieces of a new electrical service

Meter base and service panel

The utility’s meter and your main panel or disconnect, sized for your load — commonly 100A, 200A or 400A for homes and shops.

Power pole or service mast

On rural properties a pole carries the meter and panel; on buildings a mast and weatherhead do the job. We set it to the utility’s requirements.

Grounding

A grounding electrode system installed and bonded to code — checked at inspection.

Trenching and conduit

Underground service and feeders to a house, shop or barn, buried at code depth.

Temporary power

A temporary service for construction so crews have power while the permanent service is built.

Utility paperwork

Applications and scheduling with Idaho Power or MVEC — we handle the electrical side and keep you informed.

Utility coordination

Idaho Power or MVEC — it depends on your property

Different parts of Twin Falls County are served by different utilities, and their requirements and timelines differ. We confirm which utility serves your property before the estimate.

01

Confirm the utility

We check who serves your property. See MVEC vs Idaho Power.

02

Size the service

Load calculation for your home, shop, barn or equipment.

03

Permit

We pull the electrical permit with the permitting authority that covers your property.

04

Install, inspect, connect

We install the service, pass inspection and the utility makes the final connection on its schedule.

See also the Idaho Power service upgrade process. Utility scheduling is outside our control, so we plan early and keep you updated.

Cost reference

What a service costs

Cost depends on service size, distance from the utility, trenching and utility fees. For reference, our cost guide lists 3-phase service installation at $4,000 – $12,000+ for farm and commercial properties. Residential and single-phase services are quoted per site in writing — we visit, measure and give you a written estimate before work starts.

Power poles

Power Pole Installation: Permanent vs Temporary

A temporary power pole gives a building site electricity during construction. It carries a meter base, a main breaker, GFCI-protected outlets and its own grounding. It comes down once the permanent service is energized.

A permanent power pole or service post feeds a property that is not served from a house, such as a rural lot, a shop, a well, an RV pad or an irrigation pump. The utility runs its line to the pole, and the electrician installs the meter base, disconnect and feeders from there.

  • Overhead service: the utility line lands on the pole or a mast. Usually faster where poles already run nearby.
  • Underground service: conductors run in conduit in a trench. Cleaner and safer from wind and ice, but trenching adds cost.
  • Ag and shop services: often larger, or three-phase, sized with a load calculation.
Step by step

Power Pole Installation Steps for a New Property

  1. Confirm your utility. Parts of the county are served by Idaho Power and others by a co-op. See MVEC vs Idaho Power.
  2. Request service from the utility. The utility decides how it will serve the site and any line extension charges.
  3. Pick the pole or meter location with the utility, keeping clearances, truck access and future buildings in mind.
  4. Pull the electrical permit. See how electrical permits work.
  5. Set the pole or post and install the meter base, main disconnect and grounding electrodes.
  6. Trench and run conduit for underground feeders to the house, shop or pump.
  7. Pass inspection. The utility only energizes after the inspection is approved.
  8. Utility sets the meter and connects power.

Timelines depend mostly on the utility schedule and the inspection, so we confirm them for your site rather than guess.

Cost factors

What Affects the Cost of a New Service or Power Pole?

  • Distance from the utility line and from the pole to each building.
  • Overhead vs underground, including trench length and depth.
  • Ground conditions. Rock and basalt under Magic Valley soil can slow trenching.
  • Service size: 100, 200 or 400 amps, or three-phase for farm loads.
  • Utility charges for line extensions and transformers, set by the utility.
  • Extra feeders to a shop or garage, a well pump or an RV pad.

Building new? Our new construction electrician page covers the full house wiring after the service is in. For the utility side of upgrades, read the service upgrade process.

FAQ

Frequently asked questions

How long does a new service take?

It depends on the utility’s schedule as much as ours. We start the utility paperwork early and tell you where the process stands.

What is the difference between a service upgrade and a new service?

A service upgrade increases the capacity of an existing service. A new service brings power to a new building or property. See panel upgrades.

Can you install a temporary power pole for construction?

Yes. A temporary service gives your crew power during the build, and we convert or replace it when the permanent service goes in.

Do I need a permit for a new service?

Yes — and an inspection before the utility will connect. We handle both. See electrical permits.

Do you install services for farms and barns?

Yes, including 3-phase. See agricultural electrician.

How long does it take to get a new power pole installed?

The electrical work itself often takes a few days. The total time depends mainly on the utility schedule for design and connection, plus the inspection. We give you a realistic timeline once the utility confirms.

Who pays for the power line extension to my property?

Line extension charges are set by the utility, Idaho Power or the local co-op. The owner usually pays the utility directly. The electrician installs the customer side: pole or post, meter base, disconnect and feeders.

Can I install a temporary power pole myself?

In most cases no. A temporary pole needs a permit and must pass inspection before the utility will energize it. A licensed electrician builds it with the right grounding and GFCI protection.

Keep reading

Related services & guides

Idaho Power Service Upgrade Process in Twin Falls

How Idaho Power service upgrades work in Twin Falls — timeline, who calls whom, and what your electrician handles. Tervano Electric coordinates every step.

How an Idaho Power service upgrade works →

MVEC vs Idaho Power in Twin Falls County

Magic Valley Electric vs Idaho Power — who serves your Twin Falls County farm or home? Service territory map, contacts & how electrical work differs by utility.

Magic Valley Electric vs Idaho Power →

Subpanel Installation

Licensed subpanel installation in Twin Falls, Idaho for garages, shops, additions and barns. Load calculation, permit and inspection handled.

Installing a subpanel for a shop or garage →

Shop & Garage Electrical

Electrical for detached garages, shops and pole barns in Twin Falls, Idaho: feeder, trenching, subpanel, 240V circuits, lighting and permit.

Wiring a detached garage or shop →

New Construction Electrician

New construction electrical in Twin Falls, Idaho: homes, additions and commercial buildouts — service, rough-in, finish, permits and inspections.

New construction electrician in Twin Falls →

Electrical Permits

Everything about electrical permits in Twin Falls, ID. What requires a permit, City Building Dept fees & process. Tervano Electric pulls permits on every job.

How electrical permits work →

Commercial Electrician

Licensed commercial electrician in Twin Falls, ID. Tenant buildout, 3-phase power, LED retrofit & commercial panel upgrades. Serving Blue Lakes & Addison Ave.

Commercial electrician in Twin Falls →

What Size Electrical Panel Do I Need

100A, 200A or 400A panel? This guide explains panel sizing for Twin Falls homes with EV chargers, heat pumps & normal loads. Get a load calculation.

Electrical panel size guide →

Need Power to a New Building in Twin Falls County?

We handle the electrical side and utility coordination. Written estimate before work starts.

📞 Call (208) 719-5016 Get an Estimate
Call nowGet an estimate